Kitchen remodel · Dallas, TX

Kitchen Remodeling in Dallas, TX

From Preston Hollow to Lakewood, we remodel Dallas kitchens for owners who plan to stay and renovate them for owners getting ready to list. Your dedicated designer selects every finish with you before construction starts, and Justin runs the project personally.

  • A dedicated designer, finishes chosen up front
  • Comprehensive estimate within 48 hours of the walkthrough
  • Remodels in 8 to 12 weeks, schedule set before work starts
  • 1-year limited warranty on labor and materials
Remodeled kitchen at Vancouver Dr. in Preston Hollow: stained oak cabinets, quartzite counters, brass faucet, and a large island

Get a Free Estimate

Tell us about the kitchen you want.

By submitting, you agree that Renovation Sells Dallas may call, text, or email you about your project.

Vancouver Dr., Preston Hollow

A Dallas Kitchen Rebuilt as the Heart of the House

On Vancouver Dr. in Preston Hollow nobody was selling. The homeowners rebuilt the heart of the house: stained oak cabinetry with green-painted pantry and bar cabinets, quartzite counters and backsplash, brass fixtures, and an island big enough for the whole family to sit at.

Around the kitchen came a new pantry, a new hallway and office, living room built-ins, and hardwood floors throughout, a $250,000 project in all. See the full Vancouver Dr. project.

Two Dallas neighborhoods have kitchen pages of their own, Preston Hollow and Lakewood, and our luxury kitchen remodels page covers the designer end across the city.

Range wall with quartzite backsplash and oak cabinetry at Vancouver Dr. in Preston Hollow

Before and after

Cherry and Granite to Oak and Quartzite

Vancouver Dr. kitchen in Preston Hollow before the remodel: dark cherry cabinets and graniteBefore
Remodeled kitchen at Vancouver Dr. in Preston Hollow: stained oak cabinets, quartzite counters, brass faucet, and a large islandAfter
The dark cherry kitchen gave way to stained oak, quartzite, brass, and a large island. Drag to compare.

Renovation or remodel

How Much Kitchen Does Yours Need?

Not every Dallas kitchen has to come out. The walkthrough tells you which of two paths fits yours.

  • The lighter path usually keeps the layout and the cabinet boxes: cabinet painting and new hardware, countertops and a fresh backsplash, lighting, and appliances where the old ones date the room. Cosmetic kitchen updates typically finish in three to six weeks.
  • A full kitchen remodel brings new cabinetry and, when the room needs it, a new layout. It runs eight to twelve weeks, and the schedule is set before work starts.

At Prestwick Ln. in Dallas a kitchen refresh was one part of a six-week update that also took in the primary bath, the laundry room, and the powder room. At Revere Pl. in Lakewood the kitchen was rebuilt: white cabinetry anchored by a stained oak island, a paneled refrigerator and freezer, double ovens, and a pot filler over the range.

Getting ready to list? See kitchen updates before selling. For the Dallas market as a whole, see renovation in Dallas.

Kitchen at Revere Pl. in Lakewood, Dallas: white cabinetry, stained oak island, stone counters, brass hardware, and a light blue pantry behind an arched opening

Permits in Dallas

Kitchen Permits in the City of Dallas

Inside the Dallas city limits a kitchen remodel follows the City's residential permit process. The current forms are on the City's residential permit page; in plain language, they say this:

  • Repair or remodel. The City's general repair form does not cover removing a wall, structural changes, or adding to or moving plumbing, gas piping, electrical wiring, or ductwork.
  • Plans. The remodel checklist asks for floor plans showing the existing walls, any walls coming out, and any new walls, plus smoke alarm locations and, in homes with gas appliances, carbon monoxide alarm locations.
  • Lighting. A new lighting system, or replacing more than 10 percent of the light fixtures in a space, may call for a certified third-party energy code provider for plan review and inspections.
  • Who applies. The checklist says remodel permits may only be issued to a registered contractor with the proper licenses or credentials. A homeowner doing the work personally on their own homestead, with no paid help, can apply for a homeowner's permit instead.
  • Inspections. Applications, status, and inspections run through DallasNow, the City's online portal.

Who handles it: when the work needs a permit, we pull it and schedule the inspections, and our licensed electricians and plumbers pull their own trade permits, as Dallas requires.

Justin and Emily Pate, owners of Renovation Sells Dallas

Whole-project totals

Dallas-Area Kitchens, Real Budgets

Our kitchen-led remodels have run $250,000 to $350,000 as whole projects: Vancouver Dr. in Preston Hollow ($250,000), Shady Point Dr. in Plano ($300,000), and Revere Pl. in Lakewood ($350,000). Each total includes rooms beyond the kitchen.

Whole project · $250,000

Vancouver Dr., Preston Hollow

Kitchen remodel with a new pantry, a new hallway and office, living room built-ins, and hardwood floors throughout.

Whole project · $350,000 · 12 weeks

Revere Pl., Lakewood

Kitchen and primary bath remodels, a bar, powder room, china cabinets, custom built-ins, hardwood floors, and wallpaper and paint throughout.

Whole project · $300,000 · 9 weeks

Shady Point Dr., Plano

Kitchen and primary bath remodels, a new fireplace feature and built-ins, lighting, refinished hardwoods, and whole-home paint.

How it works

How a Dallas Kitchen Remodel Comes Together

  1. 01

    Tell Us About Your Kitchen

    After a quick conversation about your home and goals, we schedule an in-person walkthrough.

  2. 02

    Your Estimate Within 48 Hours

    Within 48 hours of the walkthrough you receive a comprehensive, itemized estimate and a list of suggested upgrades.

  3. 03

    Design, Chosen Up Front

    Your dedicated designer builds a mood board with you and selects every finish before anything is ordered.

  4. 04

    Built on a Set Schedule

    Remodels run eight to twelve weeks, and the schedule is set before work starts. A dedicated project manager is on site, with real-time photo updates.

“Can't say enough positive feedback for Justin, Emily and their team, who were responsive and professional at every turn. When unexpected things arose, we talked about options and were always transparent about costs.”

“I cannot say enough good things about Justin and Renovation Sells. His professionalism, quality and attention to detail is unmatched. I would highly recommend him and his team to anyone.”

“Renovation Sells has transformed our home into a place of elegant and comfortable living. We purchased a fixer upper in the North Dallas area last fall, and within a few short months we now have a beautiful new home. We highly recommend this company to anyone looking for exceptional quality workmanship and professional service.”

Tina S., North DallasGoogle review

Read more reviews

Dallas kitchen questions

Remodeling a Kitchen in Dallas

Straight answers from your local experts. All questions.

What does a kitchen remodel cost in Dallas?

It depends on the cabinetry, the stone, the appliances, and how much of the house changes around the kitchen. Our kitchen-led remodels have run $250,000 to $350,000 as whole projects, each including rooms beyond the kitchen. Pre-sale kitchen updates cost less: the pre-sale projects on this site ran from $60,000 to $135,000. The walkthrough and itemized estimate are free.

How long does a kitchen remodel take in Dallas?

Remodels run eight to twelve weeks, and we set the schedule before work starts. Revere Pl. in Lakewood, a kitchen, bar, and baths with new hardwoods throughout, took twelve. Cosmetic kitchen updates typically finish in three to six weeks.

Do I need a permit to remodel a kitchen in Dallas?

Inside the City of Dallas, it depends on the work. The City's general repair form does not cover removing walls, structural changes, or adding to or moving plumbing, gas piping, electrical wiring, or ductwork. When your plan needs a permit, we pull it and schedule the inspections.

Is a kitchen renovation different from a kitchen remodel?

A kitchen renovation can be as light as painted cabinets and new hardware, new counters and a fresh backsplash, and new lighting, which typically finishes in three to six weeks. A remodel brings new cabinetry and sometimes a new layout, and runs eight to twelve. The walkthrough tells you which yours needs.

Can we live at home during a kitchen remodel?

Usually. Most projects are phased so you can live in the house. For a whole-home remodel we plan the sequence with you before work starts and tell you exactly which weeks affect which rooms.

Who designs the kitchen?

Your dedicated designer. They build a mood board with you, select finishes and materials within your budget, and make sure the kitchen complements the rest of your home. Every finish is chosen before construction starts.

Should I update my kitchen before selling a Dallas home?

A full kitchen remodel is not always necessary before selling, but targeted updates can significantly increase buyer interest: cabinet painting, new countertops, modern hardware, and updated lighting. See kitchen updates before selling and how Renovate to Sell works.

Which Dallas neighborhoods do you remodel kitchens in?

Preston Hollow, Lakewood, North Dallas, Highland Park, and University Park. North of the city we remodel kitchens in Addison, Plano, Frisco, and Allen. Not sure about your street? Call (469) 500-3602 and ask.

Start with a walkthrough

Let's Talk About Your Dallas Kitchen

A quick conversation, an in-person walkthrough, then a comprehensive estimate within 48 hours of that visit. We live and work in the communities we serve.