Bathroom remodel · Dallas, TX

Bathroom Remodeling in Dallas, TX

Primary baths and powder rooms across Dallas, remodeled for owners who plan to stay and refreshed for owners getting ready to list. Your dedicated designer selects every finish with you before construction starts, and your estimate arrives within 48 hours of the walkthrough.

  • A dedicated designer, finishes chosen up front
  • Comprehensive estimate within 48 hours of the walkthrough
  • Remodels in 8 to 12 weeks, schedule set before work starts
  • 1-year limited warranty on labor and materials
Primary bathroom at Prestwick Ln in Dallas after the renovation: freestanding tub, chevron marble-look tile wainscot, brass tub filler, and a crystal chandelier

Get a Free Estimate

Tell us about the bathroom you want.

By submitting, you agree that Renovation Sells Dallas may call, text, or email you about your project.

Prestwick Ln., Dallas

A Spa-Inspired Primary Bath, Same Footprint

After relocating from Colorado, these homeowners bought a home in their ideal Dallas neighborhood and customized it to fit the way they live. The primary bath kept its footprint: a freestanding tub, chevron marble-look tile, painted cabinetry, brass fixtures, and a chandelier.

The powder room was transformed in the same project, along with a custom laundry room in navy cabinetry and quartzite. In all, Prestwick Ln. was a $250,000, six-week update that also covered a kitchen refresh, new flooring, paint throughout, and exterior improvements. See the full Prestwick Ln. project.

Your bathroom starts the same way. Your dedicated designer builds a mood board with you, then selects tile, stone, plumbing, lighting, and hardware within the budget you set. Nothing is ordered until you have seen it together.

Primary bathroom at Prestwick Ln in Dallas: glass shower with marble-look tile, brass hardware, and a painted vanity

Primary bathroom

Prestwick Ln., Before and After

Prestwick Ln primary bathroom in Dallas before the renovation: gray vanity and original tubBefore
Primary bathroom at Prestwick Ln in Dallas after the renovation: freestanding tub, chevron marble-look tile wainscot, brass tub filler, and a crystal chandelierAfter
Freestanding tub, chevron marble-look tile, painted cabinetry, brass fixtures, and a chandelier. Drag to compare.

Revere Pl., Lakewood

Marble, Brass, and Mosaic

At Revere Pl. in Lakewood the primary bath pairs white double vanities and brass hardware with a freestanding tub, a gray subway-tile shower with a rain head, and a blue-and-white marble mosaic floor. The powder room got floral wallpaper, a brass-framed mirror, and a marble console sink.

Both rooms were part of a twelve-week, $350,000 renovation that also rebuilt the kitchen and the bar and laid new hardwood floors throughout. For baths at this level across the city, see luxury bathroom remodels in Dallas.

Freestanding tub beside the gray subway-tile shower at Revere Pl. in Lakewood

Refresh or remodel

The Layout Decides How Far to Go

  • Refresh when the layout works and the finishes do not: paint the vanity, replace the mirror and lighting, swap hardware and fixtures, regrout or retile the shower. A bath refresh typically takes three to six weeks.
  • Remodel when the layout is the problem: a garden tub nobody uses, a cramped shower, a single sink where there should be two. Remodels run eight to twelve weeks, and a single primary bath can be faster.

Prestwick Ln. kept its footprint. At Shady Point Dr. in Plano the garden tub and framed stall became a glass walk-in shower, and at Lake Breeze Dr. in McKinney the room became a wet-room layout, finished in five weeks.

Getting ready to list? See bathroom updates before selling. For the Dallas market as a whole, see renovation in Dallas.

Primary bathroom at Shady Point Dr in Plano after the remodel: glass walk-in shower with dual rain heads, a built-in bench, stone slab walls, and a mosaic tile floor

Permits in Dallas

Bathroom Permits in the City of Dallas

Inside the Dallas city limits the City's residential permit forms draw the line this way; the current forms are on the City's residential permit page.

  • Repair or remodel. The City's general repair form does not cover removing a wall, structural changes, or adding to or moving plumbing, gas piping, electrical wiring, or ductwork.
  • Plans. The remodel checklist asks for floor plans showing the existing walls, any walls coming out, and any new walls, plus smoke alarm locations.
  • Who applies. The checklist says remodel permits may only be issued to a registered contractor with the proper licenses or credentials. A homeowner doing the work personally on their own homestead, with no paid help, can apply for a homeowner's permit instead.
  • Inspections. Applications, status, and inspections run through DallasNow, the City's online portal.

Who handles it: when the work needs a permit, we pull it and schedule the inspections, and our licensed electricians and plumbers pull their own trade permits, as Dallas requires.

Justin and Emily Pate, owners of Renovation Sells Dallas

Real budgets

Three Primary Baths, Three Budgets

Lake Breeze Dr. was a bathroom-only project. The other two were part of a larger renovation, so the budget shown is for the whole project.

Whole-home update · $250K · 6 weeks

Prestwick Ln., Dallas

A spa-inspired primary bath with a freestanding tub, chevron marble-look tile, painted cabinetry, and brass fixtures, plus a powder room and a custom laundry room.

Whole-home renovation · $350K · 12 weeks

Revere Pl., Lakewood

White double vanities, brass hardware, a freestanding tub, a gray subway-tile shower with a rain head, and a blue-and-white marble mosaic floor.

Primary bath · $60K · 5 weeks

Lake Breeze Dr., McKinney

A wet-room layout with green vertical tile, a herringbone niche, two rain showers with brass fixtures, a teak bench, and the family's clawfoot tub kept.

How it works

From Walkthrough to Finished Bath

  1. 01

    Tell Us About Your Home

    After a quick conversation about your home and goals, we schedule an in-person tour.

  2. 02

    Your Estimate Within 48 Hours

    Within 48 hours of the walkthrough you receive a comprehensive, itemized estimate and a list of suggested upgrades.

  3. 03

    Design, Chosen Up Front

    Your dedicated designer builds a mood board with you and selects every finish before anything is ordered.

  4. 04

    Built on a Set Schedule

    Remodels run eight to twelve weeks, and the schedule is set before work starts. A dedicated project manager is on site, with real-time photo updates.

“Justin and his team of experts created our dream bathroom after helping us diagnose damaged plumbing under our foundation. His designer took our ideas and created the perfect mood board which his team of contractors executed flawlessly.”

Joshua R.Google review

“I cannot say enough good things about Justin and Renovation Sells. His professionalism, quality and attention to detail is unmatched. I would highly recommend him and his team to anyone.”

“Unbelievably impressed with how responsive and professional this team is. They completed the project quickly without sacrificing any quality of work. We will definitely use for all future renovations.”

James G.Google review

Read more reviews

Dallas bathroom questions

Remodeling a Bathroom in Dallas

Straight answers from your local experts. All questions.

What does a bathroom remodel cost in Dallas?

It depends on the stone, the tile, the plumbing fixtures, and whether the layout changes. Our bathroom-only projects have run from $60,000 at Lake Breeze Dr. in McKinney to $160,000 for a Dallas primary bath. The walkthrough and itemized estimate are free.

How long does a bathroom remodel take in Dallas?

Refreshes finish in three to six weeks, and larger remodels run eight to twelve. A single primary bath can be faster: Lake Breeze Dr. in McKinney was finished in five weeks. We set the schedule before work starts.

Do I need a permit to remodel a bathroom in Dallas?

Inside the City of Dallas, it depends on the work. The City's general repair form does not cover removing walls, structural changes, or adding to or moving plumbing, gas piping, electrical wiring, or ductwork. When your plan needs a permit, we pull it and schedule the inspections.

Can you change the layout of my bathroom?

Yes. Some bathrooms become new again in the existing layout, as at Prestwick Ln. in Dallas, and some are reimagined because the layout is the problem. At Shady Point Dr. in Plano the garden tub and framed stall became a glass walk-in shower.

Can you keep my existing tub or vanity?

Yes, when it suits the room. At Lake Breeze Dr. the family clawfoot tub stayed and moved inside the new shower room. At Haven Pl. in Allen the vanities stayed and were painted. We tell you what can stay in the walkthrough.

Who designs the bathroom?

Your dedicated designer. They build a mood board with you, select finishes and materials within your budget, and make sure the room complements the rest of your home. Every finish is chosen before construction starts.

Should I remodel a bathroom before selling a Dallas home?

Usually a refresh is enough: a painted vanity, new mirror, lighting, hardware, and fixtures, with the tile regrouted or replaced. We recommend a remodel only when the layout is what buyers will reject. See bathroom updates before selling.

Which Dallas neighborhoods do you remodel bathrooms in?

Lakewood, Preston Hollow, North Dallas, Highland Park, and University Park, plus Addison and Collin County. Remodeling the kitchen too? See kitchen remodeling in Dallas. Not sure about your street? Call (469) 500-3602 and ask.

Start with a walkthrough

Let's Talk About Your Dallas Bathroom

A quick conversation, an in-person walkthrough, then a comprehensive estimate within 48 hours of that visit. We live and work in the communities we serve.